/content/hbtbt/dk/en/search-results.html

Monitors & Displays

TS120 LCBS Connect™ Wall Module

The LCBS Connect™ controller and wall module combination is designed to control constant volume air handling units and heat pumps.

Overview
The LCBS Connect™ controller and wall module combination is designed to control constant volume air handling units and heat pumps. With the embedded control logic and integral temperature humidity sensors, it controls the space temperature in a given zone by regulating the heating and cooling equipment to deliver conditioned air to that space. The LCBS Connect gateway serves as the communication device between a building site and the Honeywell cloud, providing contractors with a way to remotely monitor, control, and configure Honeywell building controllers from Honeywell’s LCBS website.Features & Benefits:
  • Monitor and troubleshoot light commercial buildings from anywhere at anytime
  • Operate more efficiently by remotely diagnosing problems and providing preventive maintenance
  • Handle issues before your customers are even aware of them
  • Grow customer satisfaction and retain service contracts
  • The efficiencies let you service more buildings without adding staff
  • The ideal solution for all your light commercial customers
Specifications

Others

  • Minimum Operating Humidity
    • 5 (Non-condensing) percentage relative humidity
  • Maximum Operating Humidity
    • 95 (Non-condensing) percentage relative humidity
  • Brand
    • Honeywell BMS NA
  • For Use With
    • LCBS Connect Controller volt
  • Product Type
    • LCBS Connect Controller Degrees Celsius

Others

  • Minimum Operating Humidity
    • 5 (Non-condensing) percentage relative humidity
  • Maximum Operating Humidity
    • 95 (Non-condensing) percentage relative humidity
  • Brand
    • Honeywell BMS NA
  • For Use With
    • LCBS Connect Controller volt
  • Product Type
    • LCBS Connect Controller Degrees Celsius
  • Minimum Operating Humidity : 5 (Non-condensing) percentage relative humidity
  • Maximum Operating Humidity : 95 (Non-condensing) percentage relative humidity
  • Brand : Honeywell BMS NA
  • For Use With : LCBS Connect Controller volt
  • Product Type : LCBS Connect Controller Degrees Celsius
Reference Guides
Name
Description
File Size
Date
Size
Technical Reference Manual
application/pdf 389.45 KB
5/11/2023
389.45 KB
Technical Reference Manual
application/pdf 2.43 MB
5/11/2023
2.43 MB
Sales Sheet
Name
Description
File Size
Date
Size
Light Commercial Building Solution-LCBS Connect (brochure)
application/pdf 1.22 MB
8/19/2021
1.22 MB
LCBS Connect (french) sell sheet
application/pdf 1.23 MB
8/19/2021
1.23 MB
Brochure
Name
Description
File Size
Date
Size
LCBS Connect (contractor) brochure
application/pdf 894.07 KB
5/11/2023
894.07 KB
LCBS Connect (french) brochure
application/pdf 1.96 MB
5/11/2023
1.96 MB
Engineering Specifications
Name
Description
File Size
Date
Size
Specification Data
application/pdf 473.92 KB
5/10/2023
473.92 KB
Installation Instructions
Name
Description
File Size
Date
Size
Installation Instructions
application/pdf 1.73 MB
5/8/2023
1.73 MB
LCBS Connect Controller Terminals wiring guide (english)
application/postscript 224.76 KB
5/8/2023
224.76 KB
Installation Instructions
application/pdf 596.96 KB
5/8/2023
596.96 KB
Manuals and Guides
Name
Description
File Size
Date
Size
Quick Start Guide
application/pdf 1.95 MB
5/10/2023
1.95 MB
Case Study
Name
Description
File Size
Date
Size
Case Study Marigold Cultural Centre for LCBS Connect (English)
application/pdf 3.26 MB
2/17/2022
3.26 MB
Relevant Solutions LCBS case study (english)
application/pdf 1.1 MB
2/17/2022
1.1 MB
Name
Description
File Size
Date
Size
Case Study Marigold Cultural Centre for LCBS Connect (English)
application/pdf 3.26 MB
2/17/2022
3.26 MB
Light Commercial Building Solution-LCBS Connect (brochure)
application/pdf 1.22 MB
8/19/2021
1.22 MB
Installation Instructions
application/pdf 1.73 MB
5/8/2023
1.73 MB
Technical Reference Manual
application/pdf 389.45 KB
5/11/2023
389.45 KB
LCBS Connect Controller Terminals wiring guide (english)
application/postscript 224.76 KB
5/8/2023
224.76 KB
Technical Reference Manual
application/pdf 2.43 MB
5/11/2023
2.43 MB
LCBS Connect (contractor) brochure
application/pdf 894.07 KB
5/11/2023
894.07 KB
LCBS Connect (french) brochure
application/pdf 1.96 MB
5/11/2023
1.96 MB
Relevant Solutions LCBS case study (english)
application/pdf 1.1 MB
2/17/2022
1.1 MB
Quick Start Guide
application/pdf 1.95 MB
5/10/2023
1.95 MB
LCBS Connect (french) sell sheet
application/pdf 1.23 MB
8/19/2021
1.23 MB
Installation Instructions
application/pdf 596.96 KB
5/8/2023
596.96 KB
Specification Data
application/pdf 473.92 KB
5/10/2023
473.92 KB
Name
Description
File Size
Date
Size
Technical Reference Manual
389.45 KB
5/11/2023
Technical Reference Manual
2.43 MB
5/11/2023
Light Commercial Building Solution-LCBS Connect (brochure)
1.22 MB
8/19/2021
LCBS Connect (french) sell sheet
1.23 MB
8/19/2021
LCBS Connect (contractor) brochure
894.07 KB
5/11/2023
LCBS Connect (french) brochure
1.96 MB
5/11/2023
Specification Data
473.92 KB
5/10/2023
Installation Instructions
1.73 MB
5/8/2023
LCBS Connect Controller Terminals wiring guide (english)
224.76 KB
5/8/2023
Installation Instructions
596.96 KB
5/8/2023
Quick Start Guide
1.95 MB
5/10/2023
Case Study Marigold Cultural Centre for LCBS Connect (English)
3.26 MB
2/17/2022
Relevant Solutions LCBS case study (english)
1.1 MB
2/17/2022