https://buildings.honeywell.com/us/en/search-results.html

Expansion Modules

M-ECH2 Expansion Line Board

The 2 or 4 line card is built and to be installed directly on the appropriate socket on the control unit, using connectors C1 and C2. Secure the card without bending or flexing it, mechanical stresses can cause failures or malfunctions

The 2 or 4 line card is built and to be installed directly on the appropriate socket on the control unit, using connectors C1 and C2. Secure the card without bending or flexing it, mechanical stresses can cause failures or malfunctions. When inserting and disconnecting the connectors, lock the card in order to avoid bending of the circuit. Finished the fixing operations to verify that the connectors are fully inserted into their housings. If present in the control panel the modem GSM-P It is NOT possible to use the line expansion card.

Certifications:
  • UNI EN ISO 9001: 2008 UNI
  • EN ISO 14001: 2004
  • I NET

Others

  • Maximum Operating Voltage
    • 9 - 15
  • Brand
    • NOTIFIER

Others

  • Maximum Operating Voltage
    • 9 - 15
  • Brand
    • NOTIFIER
  • Brand : NOTIFIER
  • Maximum Operating Voltage : 9 - 15
Image
SKU
Description
alt
M-ECH2 BASE
M-ECH 2Expansion Line Board, FTT10A, 485IG, 9 -15Vcc, 15 Vcc 160 Ma, 130x73mm